Page 2
007-09-015 Issue C September 2012
SKC Limited 11 Sunrise Park, Higher Shaftesbury Road, Blandford Forum, Dorset DT11 8ST United Kingdom
6. Prepare the cowled asbestos sampling head (225-54 or 225-54A) by unscrewing
the hosetail and removing the metal bracket and plastic sealing washer.
7. Screw the threaded hole on the
asbestos sampling head onto the male
thread at the top of the sampling mast.
Commentaires sur ces manuels